ATVs and Participants are advised that ASX will be conducting Disaster Recovery (DR) testing of a subset of systems that support BBSW calculation and publication services on 15 March - 22 March 2025 to satisfy regulatory and audit requirements.
Associated key dates are listed below.
Configuration Date |
Business Start Date |
Business Finish Date |
Cutback Date |
15/03/2025 |
17/03/2025 |
21/03/2025 |
22/03/2025 |
For Approved Trading Venues (ATVs)
• ATVs will be advised of the fix gateway to connect to as part of the failover and failback;
• ASX will be validating access to each system as part of the failover process, participants validation is not required;
• ASX is running each key system in reverse configuration, meaning that full system redundancy is available for the duration of the DR test;
• All ASX benchmark DR systems are full replica environments, meaning there will be no service degradation as a result of the DR test; and
• ASX is not failing over any aspect of the network access infrastructure solution;
• The ASX CTS team will liaise with the ATVs on the technical requirements of the DR testing.
For Participants
• Participants procedures and access methods are not changed as a result of the DR test;
• Participants are not required to perform any configurations for the DR test
Customer Technical Support will be available from 07:00 to 18:00 Monday - Friday for technical issue escalation.
Elena Nazvanova, Benchmarks Product Manager